⦁ Location: Aswan Dam.
⦁ Client: GEICO
⦁ Purpose: ROV inspection work for the 4 tunnels in station 1 at Aswan dam to know if there are any cracks, fouling or rocks inside.
⦁ Scope: Inspection using ROV with an umbilical with an average length 300m.
The longitudinal length of each tunnel is 750 m with clear spacing 75 m between the tunnels.
The inspection was for the inlets and outlets of each tunnel
Inspection showed fouling, cracks and rocks inside the tunnels.
⦁ Date: From 6 March 2021 to 20 March 2021.