Leakage repair for pipeline A6- Sumed

Scope of Work
⦁ Sandblasting and surface preparation.
⦁ MPI for the pipe crack.
⦁ Thickness measurement for the area around crack.
⦁ Stop crack propagation.
⦁ Crack grinding.
⦁ Wet welding for the crack.
⦁ MPI test for the crack after welding.
⦁ Apply of epoxy paste.
⦁ Installation and welding of steel patch.
⦁ Successful hydrotest to 1.5x working pressure.

  • Date
  • Client
    SUMED
  • Category
  • Share