Jack-Up RIG Move Positioning Services

⦁ Location: GEMSA field Platform, Red Sea, Egypt.
⦁ Client: GEMEPTCO
⦁ Purpose: Positioning equipment to assist (Rig Shelf -141) Rig Move from GEMSA P/F to Zaafarana P/F.
⦁ Scope:
1 Positioning comprises carrying out the following
1.1 Positioning of the Rig Shelf -141 Jack up Drilling Rig to GEMSA field Platform.
2 Location Range and Heading
2.1 Rig Move from Gemsa PF to Zaafarana PF.

⦁ Date: May 2021 (2 years’ Contract)

  • Date
  • Client
    GEMEPTCO
  • Category
  • Share