Construction of two industrial waste pipelines at El Nasr Petroleum co. 2020

Scope of Work
A- geotechnical investigation.
B- Bathymetric and side scan for pipeline route.
C- Provide New Engineering Solution for the project
D- Supply and driven of steel piles.
E- Supply and poring of concrete blocks.
F- Installation of HDPE 1.72m with length of 1000m.
G- Supply and installation of Steel mechanism that will support the pipelines.
H- Construction of water outlet concrete chamber.
I- Supply and installation of marker buoys.