⦁ Location: Kuwait
⦁ Client: KNPC
⦁ Purpose: Develop new offshore facilities which is an approach trestle and jetty head structures like unloading platform, berthing dolphins and mooring dolphins etc.
⦁ Scope:
1 Bathymetric Survey
⦁ A multi-beam bathymetric survey was carried out for the project area.
⦁ A multibeam survey with full coverage (100%) was carried out to provide continuous seafloor bathymetric information for hydrographic mapping and characterizing of engineering applications.
2 Side Scan Sonar Survey
3 Sub-Bottom Profiler Survey
4 Magnetometer Survey
5 Tide Measurement
⦁ Acoustic Doppler Current Profiler
⦁ One ADCP was installed at site location and collected data continuously for 30 days.
7 Seabed Sampling
7.1 10 samples were collected in plastic bags and labelled with their locations using a grab sampler.
⦁ Water Sampling
8.1 water samples were collected using Niskin water sampler.
⦁ Date: December 2023